gyti.techpedia@sristi.org
Working Model Of Pneumatic Folding Bridge
Project Description :

- this bridge is made up of four links, from that two links are fixed and two links are moveable. we make 16 feet long bridge. by giving pressurized air, moveable links are lifted up at 70 degree and then slowly, it becomes horizontal.

 
Other Photos :
 

No Updates

 
Project Details :
  • Innovator : VYAS JAYKUMAR NITINKUMAR
  • Team Members : MAHESH PANSURIYA, VASRAM BHARVAD, CHIRAG PARIKH
  • Guide Name : PROF. POONAM V. SAVSANI
  • College : B.H.GARDI COLLEGE OF ENGINEERING AND TECHNOLOGY
  • University : GUJARAT TECHNOLOGYCAL UNIVERSITY
  • Submission Year : 2012
  • Category : Mechanical/Textile
Share Project :